| No | AD Class | Class Number | Issue Date | Subject | Approval Holder Type/Designation | Effective Date | ATA Chapter | Actions |
|---|---|---|---|---|---|---|---|---|
| 1 | AD | F-1989-033-019R1 | 1989-03-31 | Pitch trim | ATR ATR42 | 1989-03-31 | 00 | |
| 2 | AD | ES-212-27-23R1 | 1986-10-31 | Accomplish CASA SB 212-27-23 Revision 1 | AIRBUS DEFENCE & SPACE S.A. C-212 | 1986-10-31 | 00 | |
| 3 | AD | G-003-03-84 | 1984-03-01 | Ice and Rain Protection - To monitor LH and RH propeller anti-ice current consumption. | BAE SYSTEMS (OPERATIONS) LTD Jetstream 3100 | 1984-03-01 | 00 | |
| 4 | AD | NL-1980-015 | 1980-03-25 | DUNLOP MLG ACTUATING RAM RETAINING RING P/N ACM18254 SERVICE LIFE REDUCTION | FOKKER SERVICES F27 | 1980-03-28 | 00 | |
| 5 | AD | G-0077-PRE80 | 1980-01-01 | Electrical Power - Emergency power supply for electrically operated gyro horizon. | BAE SYSTEMS (OPERATIONS) LTD HS748 | 1980-01-01 | 00 | |
| 6 | AD | NL-1976-030 | 1976-05-11 | AILERON FEEL/TRIM SPRING UNIT MODIFICATION | FOKKER SERVICES F28 | 1976-05-11 | 00 | |
| 7 | AD | IT-1967-70 | 1967-06-30 | Flaps control system | LEONARDO S.p.A. AIRCRAFT S205 | 1967-06-30 | 00 | |
| 8 | AD | US-2017-12-07 | 2017-06-27 | SUPERSEDED BY FAA AD 2020-01-11 | BOEING 737 | 2017-07-20 | 21 | |
| 9 | AD | 2023-0126 | 2023-06-23 | Electrical Power - Equipment Power Distribution / Main Power Supply Wiring - Inspection | SONACA AIRCRAFT S.A. S2 | 2023-07-07 | 24 | |
| 10 | AD | US-2003-24-14 | 2003-12-04 | Electrical Wiring Installations - Inspection | BOEING DC-9 MD-88 | 2004-01-08 | 24 |