| 1 |
AD |
F-1989-051 |
1989-03-22 |
Brake cylinder |
ORPHANED (No TC Holder) CERVA WASSMER |
1989-04-01 |
00 |
|
| 2 |
AD |
F-1986-034-015R2 |
1986-10-29 |
Main rotor head - Roving sleeve beams |
AIRBUS HELICOPTERS SA/AS 365 / EC 155 |
1986-10-29 |
00 |
|
| 3 |
AD |
F-1984-017-021 |
1984-02-01 |
Horizontal stabilizer P/N 355A13.0520.01.01 - Service life limitation |
AIRBUS HELICOPTERS AS 355 |
1984-02-08 |
00 |
|
| 4 |
AD |
F-1980-060-027 |
1980-03-12 |
Main gearbox input pinion flange checking slot nut for torque loading |
AIRBUS HELICOPTERS SA 341/342 |
1980-03-19 |
00 |
|
| 5 |
AD |
G-0075-PRE80 |
1980-01-01 |
Propellers - Introduction of an electrical selection to the pitch coarsening solenoid when manually feathering a propeller. |
BAE SYSTEMS (OPERATIONS) LTD HS748 |
1980-01-01 |
00 |
|
| 6 |
AD |
F-1976-062 |
1976-04-14 |
Oil Return Pipes |
DAHER AEROSPACE M.S. 890 Rallye 150 Rallye 235 |
1976-04-21 |
00 |
|
| 7 |
AD |
US-67-09-02 |
1967-03-21 |
Main Rotor Mast |
ORPHANED (No TC Holder) BRANTLY |
1967-04-20 |
00 |
|
| 8 |
AD |
US-2017-06-03 |
2017-04-04 |
MEGGITT (TROY) INC. - Combustion Heaters - Inspection / Pressure Test / Deactivation / Removal |
APPLIANCES ATA 21 AIR CONDITIONING |
2017-05-05 |
21 |
|
| 9 |
AD |
CF-2023-27 |
2023-05-05 |
Electrical System Installation - Rear Cabin - Low Clearance Condition |
AIRBUS CANADA LP BD-500 (A220 Series) |
2023-05-18 |
24 |
|
| 10 |
AD |
F-2003-412 |
2003-11-12 |
Electrical System - Wiring Modification at Rack 107VU and Contactor 9DG Relocation |
AIRBUS S.A.S. A300-600 A310 |
2003-11-22 |
24 |
|