| No | AD Class | Class Number | Issue Date | Subject | Approval Holder Type/Designation | Effective Date | ATA Chapter | Actions |
|---|---|---|---|---|---|---|---|---|
| 1 | AD | G-2004-0007 | 2004-03-16 | SUPERSEDED BY CAA UNITED KINGDOM AD G-2004-0031 | BAE SYSTEMS (OPERATIONS) LTD AVRO146RJ BAE146 | 2004-04-08 | 49 | |
| 2 | AD | BR-2007-03-01R1 | 2008-05-22 | Cargo Door Closed Indication Sensor Relocation / Cargo Door Locking Mechanism Modification | EMBRAER S.A. ERJ 170 | 2008-06-09 | 52 | |
| 3 | AD | 2014-0076R3 | 2021-11-30 | SUPERSEDED BY 2022-0051 | AIRBUS HELICOPTERS AS 350 / EC 130 AS 355 | 2021-12-07 | 53 | |
| 4 | EAD | 2016-0191-E | 2016-09-27 | Fuselage - Door Window Frame / Emergency Window Seal - Inspection | WSK PZL-SWIDNIK S.A. SW4 | 2016-09-29 | 53 | |
| 5 | AD | US-2012-05-06 | 2012-04-11 | Fuselage - Structurally Significant Details (SSDs) - Inspection / Repair | LOCKHEED MARTIN CORPORATION L-1011 (Tristar) | 2012-05-10 | 53 | |
| 6 | AD | US-2006-05-09 | 2006-03-31 | SUPERSEDED BY FAA AD 2010-26-10 | BOEING 747 | 2006-04-13 | 53 | |
| 7 | AD | US-90-23-14 | 1990-11-06 | SUPERSEDED BY FAA AD 2013-16-24 | BOEING 747 | 1990-12-11 | 53 | |
| 8 | AD | US-2023-02-09 | 2023-03-02 | Horizontal Stabilizer - Inspection | BOEING DC-9 MD-88 | 2023-03-20 | 55 | |
| 9 | AD | US-2002-01-01 | 2002-01-14 | SUPERSEDED BY FAA AD 2006-12-23 | BOEING 737 | 2002-02-19 | 55 | |
| 10 | AD | US-2019-16-12 | 2019-09-05 | Wings - Vertical Stiffeners - Installation / Replacement | BOEING 737 | 2019-10-09 | 57 |